Henry Borden Hydroelectric Power Plant

External Power Plant

The oldest of the power plants encompasses eight penstock, and a conventional power house. The first unit was inaugurated during 1926, and the other were installed until 1950, totaling eight generation groups, with an installed capacity of 469 MW.
Each generator is powered by two Pelton type turbines, activated by the waters driven from the Rio das Pedras Reservoir, which reach the Valves' Housing where, after passing through two butterfly valves by means of penstock, go down the hillside reaching their respective turbines, completing an approximate distance of 1,500 meters.

Underground Power Plant

The Power Plant encompasses six generation groups, installed inside the rocky massive of the Serra do Mar, in a cave 120 m long, 21 m wide and 39 m high, which 420MW of installed capacity.
The first generation group started operating in 1956. Each generator is powered by one Pelton turbine, activated by four water jets.

Click to see also Porto Góes and Rasgao
 
 
thermoelectric power station
hydroelectric power stations